Silouette.

September 1965. At unusually short freight heads east from Gato. The Farmington branch was closed for several weeks to rebuild a soft fill, so the only traffic was lumber and coal from Durango. And the train was further delayed by a sinkhole between Carbon Junction and Falfa that had to be filled.